« Home

Rolling Stock

More than 300 rail vehicles were damaged as a result of flooding during Superstorm Sandy. The continuing repair of affected locomotives and passenger coaches, using both NJ TRANSIT labor forces and third-party contractors, is essential for providing service and critical for the preparedness for future storm events.

Third-party services engaged for this effort are:

STV, Inc., Newark, NJ

LTK Engineering, Newark, NJ

Pre-Storm Trains Operated March 2014 Percent
Rail Service Levels -
Daily Trains Operated
700 704 99%
ACLR 24 24 100%
RVL 53 53 100%
NJCL 114 114 100%
NEC 139 139 100%
Montclair-Boonton 65 67 103%
Morris-Essex (incl GSB) 147 152 103%
PVL 40 40 100%
Main/Bergen 92 89 97%
So. Tier 26 26 100%

Rail Fleet Restoration Status (7/18/14)

Type Total Fleet Vehicles Damaged Returned to Service Awaiting Repair Available for Service Current Percentage Available
Rail Cars 1113 247 242 5 1108 100%
Multilevel Coach 429 85 85 0 429 100%
Multiple Unit 160 35 35 0 160 100%
Single Level Coach 524 127 122 5 519 99%
Locomotives 210 72 67 5 205 98%
Dual-Power Locomotive 26 11 10 1 25 96%
Electric Locomotive 65 11 7 4 61 94%
Diesel Locomotive 119 50 50 0 119 100%
Total Fleet 1323 319 309 10 1313 99%